Don not know how to maintain the tiles? Save it soon!
Release date:2021-11-19 Reading volume:623
 Paving and maintenance of tiles
1. Leave seams for paving: general microcrystalline stones, full polished glaze, leave about 2mm seams, polished tiles, interior wall tiles, leave 1MM seams, antique tiles leave about 2MM seams, small size antique tiles leave about 3MM seams , Used with the cross.
 
2. Water soaking before laying: The tiles need to be laid by wet laying method, that is, the tiles need to be placed upright before the tiles are laid so that the tiles can be completely immersed in clean water for more than 3 hours (defined as no bubbles coming out of the water surface). In order to make the color of the tiles consistent after soaking in water, it is recommended that the tiles in the same area are infiltrated at the same time. At the same time, it is recommended to soak in water according to actual needs. The tiles that have been soaked in water will affect the secondary sales, and the merchants generally do not return or exchange them.
 
3. Processing and cutting: ceramic products are easy to be damaged after processing, so there must be room for calculating the quantity. Be careful when processing the ceramic tiles, especially when the wall tiles touch the external corners, be careful to grind the edges, not to damage the glaze layer of the tiles, and pay attention to leaving the seams when connecting, and they should not be too small.
 
4. Brick arrangement plan: Before the tiles are laid, muddy water is required to manually arrange the brick arrangement plan to avoid unnecessary waste and loss. During the paving process, if the plasterer finds a size or quality problem, please notify it in time, so that the material party and the construction party can be identified and resolved in time.
 
5. Paving protection: It needs to be protected during construction to avoid scratching or polluting the brick surface. After the floor tiles are laid, the surface protection should be done, and waste paper boxes, films, gypsum boards, etc. should be laid to prevent scratches. The protective film on the surface of the microcrystalline stone should not be removed during the paving process. Do not use motors, woodworking machines and other equipment within three days after the product is laid, so as to avoid the phenomenon of hollowing caused by the vibration of the ceramic tile and the bonding later.
 
6. Clean up the joints: about one hour after the tile is laid, the cement should be wiped clean with a sponge in time to prevent the surface from being contaminated for a long time and difficult to handle. Do not joint the tiles immediately. It is generally better to joint more than seven days after the paving. This is conducive to the volatilization of the water in the brick body, so that the color of the tiles can be restored quickly, and it can effectively prevent the bright water from penetrating into the brick body from the mortar joints again. Peripheral discoloration appears.
 